Definition

Preparation start

30 days ahead: 30 days before the first day of the peak month. It is the day the last four weeks of preparation begin; for a 2x peak month, preparation starts here.

On the first day of the peak month, the Line, the Closing, and the Entrance are published, and the Sheet is in the Folder. That is the state in which you can greet the peak month. Preparation becomes not "a task someone pushes hard on," but routine work with a set order and set days for checking. The top executive can see progress through a single weekly check, without holding meetings.

Key points: The order of preparation is the Sheet, the Line, the Closing, the Entrance. At the end of each week, the top executive checks just one thing. No meetings are held. If the previous week is empty, don't move on to the next. Perhaps this is what "more haste, less speed" means.

All definitions

AQ GROW | AI Search Structure

Practice areas

This page, “Preparation start”, sits in AQ GROW’s work on AI search, entity design, structured data, and technical SEO. The practice is information infrastructure that search engines and generative AI can read with the same meaning.

AQ GROW provides site-structure design that brings these practice areas together for decision-makers at companies and sole proprietors. Search engines, generative AI, and people can read the same facts.

Enlarge figure

Enlarged figure